Illinois State Library

Electronic Documents of Illinois


Search:
I* in FirstOrganization [X]
Illinois Environmental Protection Agency, Bureau of Water in Organization [X]
rss icon RSS
Results:  517 Items
Sorted by:  
Page: 1 2 3 4 5   ...  Next
SiteTitle
2001 305(b) Summary Report (1999 data) Inland Lakes (1)
2008 Final Federal CAFO Rule Frequently Asked Questions (1)
2008 Groundwater Protection Policy Forum: Groundwater Degradation and Sustainability, Pere Marquette, Peoria, IL, September 24th, 2008 (1)
Altamont New Reservoir TMDL Report (1)
Appendices to Cahokia Creek/Holiday Shores Lake Watershed Total Maximum Daily Load Stage Three Report (1)
Aquatic Exotics (1)
Aquatic Plant Management Options (1)
Arsenic in Illinois Groundwater (1)
Artificial Structures for Fish Cover (1)
Ashland New Lake Watersheds TMDL Stage Three Draft Report (1)
Ashland New Reservoir Watershed TMDL Stage One Draft Report (1)
Ashland New Reservoir watershed TMDL report (1)
Assessment of Total Chromium in Illinois Community Water Supplies (1)
Baseline Loadings of Nitrogen, Phosphorus, and Sediments from Illinois Watersheds (1)
Bay Creek Watershed TMDL Report (1)
Bay Creek Watershed TMDL Stage One Third Quarter Draft Report (1)
Bay Creek Watershed TMDL Stage Three Report (1)
Beaucoup Creek TMDL Report (1)
Beavers and Muskrats (1)
Big Muddy River TMDL Report (1)
Bonnie Creek TMDL Report (1)
Bonpas Creek Watershed Total Maximum Daily Load: Stage 1 Report, Draft (1)
Cahokia Canal Watershed TMDL Report (1)
Cahokia Canal/Horseshoe Lake Watershed TMDL: Stage One [Third Quarter Draft Report] (1)
Cahokia Canal/Horseshoe Lake Watershed Total Maximum daily Load Stage Three Report (1)
Cahokia Creek/Holiday Shores Lake Watershed TMDL: Stage One Third Quarter Draft Report (1)
Cahokia Creek/Holiday Shores Lake Watershed Total Maximum Daily Load Stage Three Report (1)
Cahokia Creek/Holiday Shores Lake watershed TMDL Report (1)
Canada Geese and Your Lake (1)
Canton Lake TMDL Development Stage 1 Report: Final (1)
Capacity Development Strategy for Existing Public Water Supplies, July 2000 (1)
Casey Fork TMDL Report (1)
Cedar Creek TMDL Report (1)
Cedar Creek Watershed TMDL Report (1)
Cedar Creek/Cedar Lake TMDL Implementation Plan: Public Review Draft Report (2)
Cedar Creek/Cedar Lake Watershed TMDL Stage One Third Quarter Draft Report (1)
Charleston Side Channel Reservoir Restoration Plan: Clean Lake Program Phase 1 Diagnostic Feasibility Study (1)
Charleston Side Channel Reservoir TMDL: Progress Report #1 (1)
Charleston Side Channel Reservoir TMDL: Progress Report #2 (1)
Charleston Side Channel Reservoir TMDL: Progress Report #3 (1)
Charleston Side Channel Reservoir TMDL: Progress Report #4 (1)
Charleston Side Channel Reservoir TMDL: Progress Report #5 (1)
Charleston Side Channel Reservoir TMDL: Progress Report #6 (1)
Charleston Side Channel Reservoir TMDL: Progress Report #7 (1)
Charleston Side Channel Reservoir TMDL: Progress Report ... (1)
Charleston Side Channel Reservoir Total Maximum Daily Load Report: Coles County, Illinois (1)
Charleston Side-Channel Reservoir Sedimentation Basin Project Final Report (1)
Chicago Botanic Garden Lakes: Illinois Clean Lakes Program Phase 2 Final Report (1)
Chloride Usage Education and Reduction Program Study: Final Report (1)
Chromium-6 Strategic Plan (1)
Clean Water Action Plan: Restoring and Protecting America's Waters: Unified Watershed Assessment and Watershed Restoration Priorities for Illinois (1)
Common Lake Water Quality Parameters (1)
Condition of Illinois Water Resources (2)
Consumer Confidence Report Guidance Manual (1)
Countryside Lake Water Quality Monitoring Program: Final Report (1)
Crab Orchard Creek Watershed TMDL Implementation Plan: Public Review Draft Report (1)
Crab Orchard Creek Watershed TMDL Stage One Third Quarter Draft Report (1)
Crab Orchard Watershed TMDL Report (1)
Crooked Creek Watershed TMDL Implementation Plan: Draft Report (1)
Crooked Creek Watershed TMDL Report (1)
Crooked Creek Watershed TMDL Stage One Third Quarter Draft Report (1)
Des Plaines River/Higgins Creek Watershed TMDL Report (1)
Des Plaines River/Higgins Creek Watershed TMDL Report: Draft (1)
Des Plaines River/Higgins Creek Watershed TMDL Stage 1 Report (1)
Determining Your Lake's Watershed (1)
Digester/Over the Spillway (29)
DuPage River and Salt Creek TMDL - Stage 2 Development of Septic System Map for Targeted Subbasin: Final Report (1)
DuPage River/Salt Creek Watershed TMDL Stage 1 Report (1)
DuPage River/Salt Creek Watershed TMDL Stage 1 Report and Stage 2 TMDL - Sediment Oxygen Demand Monitoring (1)
Dutchman Creek TMDL Report (1)
East Fork Kaskaskia River TMDL Report (1)
East Fork Kaskaskia River/Farina Lake Watershed Simazine Total Maximum Daily Load (TMDL): Draft Report (1)
East Fork Kaskaskia Watershed TMDL River (1)
East Fork LaMoine River Watershed TMDL Report (1)
East Fork LaMoine River/Spring Lake Watershed TMDL Stage One Third Quarter Draft Report (1)
Evergreen Lake Watershed Plan (1)
Evergreen Lake watershed TMDL report (1)
Facility Planning Area Research: Final Program Evaluation (2)
Fecal Coliform TMDL Development for the Little Vermilion River, Illinois: Public Review Draft Report (2)
Fertilizers and Pesticides: Options for Lawn and Garden Use (1)
Final Approved Stage Three Report TMDLs for Target Watersheds: Project Watershed HUC 0714020205 (East Fork Kaskaskia River) Stream Segments IL_OK-01 and IL-OK-02 (1)
First Quarterly Progress Report: Project Watershed HUC 0714020205 (East Fork Kaskaskia River) (1)
Framework for a Basinwide Planning and Protection Pilot (1)
Galena/Sinsinawa Rivers Watershed TMDL Stage 1 Report: Draft Report for Public Review (1)
Georgetown Lake TMDL Implementation Plan: Public Review Draft Report (1)
Glenn Shoals-Hillsboro Watershed TMDL Report (1)
Glenn Shoals/Hillsboro Watershed: Lake Glenn Shoals (ROL), Old Lake Hillsboro (ROT): ... Quarterly Progress Report [includes First, Second, and Third Quarterly Reports] (1)
Glenn Shoals/Hillsboro Watershed: Lake Glenn Shoals (ROL), Old Lake Hillsboro (ROT): Draft TMDL (1)
Glenn Shoals/Hillsboro Watershed: Lake Glenn Shoals (ROL), Old Lake Hillsboro (ROT): Final Stage 1 Progress Report (1)
Governor Bond Lake Greenville, Illinois Total Maximum Daily Loads (1)
Governor Bond TMDL Report (1)
Greenville Lake and Coffeen Lake TMDL: Draft Stage 1 Report: Watershed Characterization, Data Analysis, And Methodology selection (1)
Greenville Old Lake and Coffeen Lake Watersheds (1)
Guidance Document for Groundwater Protection Needs Assessments (1)
Guidance for Developing Watershed Action Plans in Illinois (1)
Highland Silver Lake Watershed (ROZA): ... Quarterly Progress Report [includes First, Second and Third Quarterly Reports] (1)
Highland Silver Lake Watershed (ROZA): Draft TMDL (1)
Highland Silver Lake Watershed (ROZA): Final Stage 1 Progress Report (1)
Highland Silver Lake Watershed TMDL Report (1)
Hobson Creek Corridor Restoration Project, Phase 1: Tributary 6 to the East Branch DuPage River: Section 319 Project Report (1)
Hobson Creek Corridor Restoration Project, Phase 2: Tributary 6 to the East Branch DuPage River: Section 319 Project Report (1)
Hobson Creek Corridor Restoration Project, Phase 3: Tributary 6 to the East Branch DuPage River: Section 319 Project Report (1)
Hodges Creek TMDL [Stage 3 Draft] (1)
Hodges Creek Watershed Final Stage 1 Progress Report (1)
Hodges Creek Watershed: Otter Lake (RDF), Palmyra-Modesto Lake (RDZP), Hettick Lake (SDZF): Draft TMDL (1)
Hodges Creek watershed TMDL report (1)
Home and Yard (1)
Homer Lake Watershed TMDL report (1)
Horseshoe Lake (Alexander County) Watershed TMDL Report (1)
Horseshoe Lake Watershed Total Maximum Daily Load: Stage 1 Report, Draft (1)
Illinois 2002 Section 303(d) List (1)
Illinois Annual Report on the Efficacy of Capacity Development (1)
Illinois Annual Report on the Efficacy of Capacity Development, October 1, 2010 (1)
Illinois Annual Report on the Efficacy of Capacity Development, September 30, 2005 (1)
Illinois Annual Report on the Efficacy of Capacity Development, September 30, 2006 (1)
Illinois Annual Report on the Efficacy of Capacity Development, September 30, 2007 (1)
Illinois Annual Report on the Efficacy of Capacity Development, September 30, 2009 (1)
Illinois Annual Report on the Efficacy of Capacity Development, September 30, 2012 (1)
Illinois Annual Report on the Efficacy of Capacity Development, September 30, 2013 (1)
Illinois Benthic Macroinvertebrate Collection Method Comparison and Stream Condition Index Revision [2004: rev 2007] (1)
Illinois Clean Lakes Program (1)
Illinois EPA Ambient Groundwater Monitoring Network Factsheet (1)
Illinois EPA Clean Lakes Program: Clean Lakes Study Review and Implementation Report for Lake Hillsboro, Montgomery County, Illinois (1)
Illinois EPA Clean Lakes Program: Phase 1 Diagnostic/Feasibility Study of Cedar Lake and Carbondale Reservoir, Carbondale, IL (Final Report - January 2009) (1)
Illinois EPA Clean Lakes Program: Phase 1 Diagnostic/Feasibility Study of Highland Silver Lake, Highland, IL: Final Report (1)
Illinois EPA Clean Lakes Program: Phase 1 Diagnostic/Feasibility Study of Kinkaid Lake, Jackson County, IL (Final Report - September 2006) (1)
Illinois EPA Clean Lakes Program: Phase 1 Diagnostic/Feasibility Study of Lake Vermilion, Vermilion County, IL: final draft submittal (1)
Illinois EPA Clean Lakes Program: Phase I Diagnostic / Feasibility Study of Campus Lake, Southern Illinois University, Carbondale, Jackson County, Illinois (1)
Illinois EPA Livestock Program 1999 livestock facility investigation annual report (1)
Illinois EPA Livestock Program 2000 livestock facility investigation annual report (1)
Illinois EPA Livestock Program 2001 livestock facility investigation annual report (1)
Illinois EPA Livestock Program 2002 livestock facility investigation annual report (1)
Illinois EPA Livestock Program 2003 livestock facility investigation annual report (1)
Illinois EPA Livestock Program 2004 livestock facility investigation annual report (1)
Illinois EPA Livestock Program 2005 livestock facility investigation annual report (1)
Illinois EPA Livestock Program 2006 livestock facility investigation annual report (2)
Illinois EPA Livestock Program 2007 livestock facility investigation annual report (1)
Illinois EPA Livestock Program 2008 livestock facility investigation annual report (1)
Illinois EPA Livestock Program 2010 Livestock Facility Investigation Annual Report (1)
Illinois EPA Livestock Program 2011 Livestock Facility Investigation Annual Report (1)
Illinois EPA's Ash Impoundment Strategy Progress Report (4)
Illinois Environmental Protection Agency Clean Lakes Program: Phase 1 Diagnostic Feasibility Study, Glenn Shoals Lake, City of Hillsboro, Montgomery County, Illinois (1)
Illinois Environmental Protection Agency Clean Lakes Program: Phase 1 Diagnostic Feasibility Study, Governor Bond Lake, City of Greenville, Bond County, Illinois (1)
Illinois Environmental Protection Agency Clean Lakes Program: Phase 1 Diagnostic Feasibility Study, Staunton Lake, City of Staunton, Macoupin County, Illinois (1)
Illinois Environmental Protection Agency Clean Lakes Program: Phase 1 Diagnostic and Feasibility Study, Patriots Park Lake, Kingsbury Park District, Bond County, Illinois (1)
Illinois Groundwater Protection Program: A Biennial Report (2)
Illinois Groundwater Protection Program: Biennial Comprehensive status and self-assessment report (1)
Illinois Groundwater Protection Program: Biennial Status and Self-Assessment Report (1)
Illinois Groundwater Protection Program: Biennial comprehensive status and self-assessment report, Executive Summary (1)
Illinois Groundwater Protection Program: Biennial policy report (1)
Illinois Groundwater Protection Program: volume 1: Biennial Policy Report (1)
Illinois Groundwater Protection Program: volume II: biennial program report (1)
Illinois Groundwater Protection Program: volume III: biennial technical appendices report (1)
Illinois Integrated Water Quality Report and Section 303(d) List (1)
Illinois Lake Michigan (nearshore) Toxics TMDL Scoping Report (1)
Illinois Lakeshore Birds (1)
Illinois Public Water Supply Emergency Procedures Quick Reference Guide (1)
Illinois River (Peoria Area) TMDL and LRS Development: Watershed Characterization and Source Assessment Report (Stage 1) [review draft] (2)
Illinois Volunteer Lake Monitoring Program (VLMP) (1)
Illinois Volunteer Lake Monitoring Program Newsletter (8)
Illinois Volunteer Lake Monitoring Program Newsletter: (1)
Illinois Water Monitoring Strategy, 2007-2012 (1)
Illinois Water Pollution Control Loan Program,Annual Report, FY ... (1)
Illinois Water Pollution Control Loan Program,Annual Report, [FY 2007] (1)
Illinois Water Quality Report (2)
Illinois' Nonpoint Source Management Program (2)
Kickapoo Creek Project - Phase I: IEPA 319 Grant: Final Report (1)
Kinkaid Lake TMDL Best Management Practices Implementation: Project Evaluation and Final Report (1)
Lake Beat (2)
Lake Bloomington TMDL: Draft Stage 1 Report: Watershed Characterization, Data Analysis, and Methodology Selection (1)
Lake Bloomington TMDL: Final Stage 1 Report: Watershed Characterization, Data Analysis, and Methodology Selection (1)
Lake Bloomington Watershed Plan (1)
Lake Bloomington Watershed TMDL Implementation Plan: Public Review Draft (1)
Lake Bloomington Watershed TMDL Report (1)
Lake Bloomington Watershed TMDL Stage 3 Public Draft Report (1)
Lake Carlinville Atrazine Total Maximum Daily Load (TMDL): Draft Report (1)
Lake Dredging (1)
Lake Education Assistance Program (LEAP) (1)
Lake Glenn Shoals/Hillsboro Old Lake Atrazine Total Maximum Daily Load (TMDL): Draft Report (1)
Lake Mattoon and Lake Paradise Simazine Total Maximum Daily Load (TMDL): Draft Report (1)
Lake Michigan Beaches TMDL Stage-One Responsiveness Summary (1)
Lake Oakland TMDL Implementation Plan: Public Review Draft Report (2)
Lake Oakland Watershed TMDL Report (1)
Lake Springfield Watershed TMDL Stage 1 Report: Draft Report (1)
Lake Stratification and Mixing (1)
Little Muddy River TMDL Report (2)
Little Vermilion River Fecal Coliform TMDL Implementation Plan: Public Review Draft Report (1)
Little Wabash II Watershed TMDL Report (1)
Little Wabash River I Watershed TMDL Implementation Plan: Public Review Draft Report (1)
Little Wabash River II Watershed TMDL Implementation Plan: Public Review Draft (1)
Little Wabash River TMDL: Stage 1 Public Draft Report (1)
Little Wabash River Watershed TMDL Stage One Third Quarter Draft Report (1)
Little Wabash River Watershed: Stage 2 Data Report (2)
Little Wabash Watershed: Final Stage 1 Progress Report (1)
Load Reduction Strategy and TMDL Draft: Indian Creek, Dago Slough and Prairie Creek (1)
Lower Kaskaskia River Watershed TMDL Report (1)
Lower Kaskaskia River Watershed TMDL Stage One: Final Report (2)
Lyman Woods Streambank Stabilization PSA 2, Phases 1 and 2: Tributary to the East Branch DuPage River: Section 319 Project Report (1)
Macoupin Creek Watershed Draft TMDL (1)
Macoupin Creek Watershed TMDL Report (1)
Maple Lake Rehabilitation and Protection Program: Phase 2 Implementation Project Report [at head of title: Illinois Clean Lakes Program] (1)
Mary's River/North Fork Cox Creek TMDL Implementation Plan: Public Review Draft Report (1)
Mary's River/North Fork Cox Creek Watershed TMDL Report (1)
Mary's River/North Fork Cox Creek Watershed TMDL Stage One Third Quarter Draft Report (1)
Mauvaise Terre Creek Watershed Final Approved TMDL (1)
Mauvaise Terre Creek Watershed TMDL Report (2)
Mauvaise Terre Creek Watershed TMDL: January 2011 Revision (1)
Mauvaise Terre Creek Watershed: Final Stage 1 Progress Report (1)
Maximum Setback Zone Workbook (1)
McCullom Lake Evaluation Report (1)
Methyl Tertiary Butyl Ether (MTBE) in Illinois (1)
Middle Fork Saline River Watershed TMDL Stage One: Final Report (2)
Middle Fork Saline River Watershed TMDL Stage Three Draft Report (1)
Middle Illinois River Total Maximum Daily Load and Load Reduction Strategies: Draft (1)
Middle Illinois River Total Maximum Daily Load and Load Reduction Strategies: Final TMDL (1)
Middle Saline River Watershed TMDL Report (1)
Milfoil Weevil (1)
Monitoring Lake Quality (1)
Mt. Olive New Lake, Mt. Olive Old Lake and Staunton Lake Watersheds TMDL Report (1)
Nashville City Reservoir and Washington County Lake Atrazine and Simazine Total Maximum Daily Load (TMDL): Draft Report (1)
North Fork Kaskaskia River Watershed Final Approved TMDL (1)
North Fork Kaskaskia River Watershed TMDL Report (1)
North Fork Kaskaskia River Watershed: ... Quarterly Progress Report [includes First, Second and Third Quarters] (1)
North Fork Mauvaise Terre Creek Watershed Draft Stage 3 Report (1)
North Fork Vermilion River Atrazine Total Maximum Daily Load (TMDL): Draft Report (1)
North Fork Vermilion River Watershed TMDL Implementation Plan: Public Review Draft Report (2)
North Fork Vermilion River and Lake Vermilion TMDL Stage 1 Report: Watershed Characterization, Data Analysis, and Methodology selection (2)
North Fork Vermilion River and Lake Vermilion TMDL: Draft Stage 3 Report (1)
Other Coal Ash Sites (1)
Otter Lake Shoreline Erosion Control Project (1)
Part 2: Lake and Watershed Management Plan, Carlinville, Macoupin County, Illinois (1)
Pecatonica River Total Maximum Daily Load and Load Reduction Strategies: Stage 1 Report (1)
Phase I Diagnostic/Feasibility Study: Lake Paradise, Coles County, Illinois (1)
Phase II Implementation Report for Campus Lake, Jackson County, Illinois (1)
Phosphorus: A Summary of Information Regarding Lake Water Quality (1)
Prairie Creek / Langan Creek Watershed Total Maximum Daily Load Stage One Report (1)
Prairie Creek Watershed TMDL Report (1)
Pressure-Treated Wood (1)
Primer Regarding Certain Provisions of the Illinois Groundwater Protection Act (1)
Public Water Supply Loan Program (PWSLP) (1)
Public Water Supply Loan Program Annual Report, FY ... . (1)
Public Water Supply Loan Program Annual Report, [FY 2007] (1)
Quality Assurance and Field Methods Manual (1)
Quarterly Report 1 (July-September 2001): West Branch DuPage River Watershed (1)
Quarterly Report 1: Beaucoup Creek Watershed (1)
Quarterly Report 1: Big Muddy River #1 Watershed (1)
Quarterly Report 1: Big Muddy River #2 Watershed (1)
Quarterly Report 1: Bonnie Creek Watershed (1)
Quarterly Report 1: Casey Fork Watershed (1)
Quarterly Report 1: Little Muddy River Watershed (1)
Quarterly Report 1: Little Wabash River Watershed (1)
Quarterly Report 1: Vandalia Lake Watershed (1)
Quarterly Report 2 (October-December 2001): West Branch DuPage River Watershed (1)
Quarterly Report 2: Beaucoup Creek Watershed (1)
Quarterly Report 2: Big Muddy River #1 Watershed (1)
Quarterly Report 2: Big Muddy River #2 Watershed (1)
Quarterly Report 2: Bonnie Creek Watershed (1)
Quarterly Report 2: Casey Fork Watershed (1)
Quarterly Report 2: Dutchman Creek Watershed (1)
Quarterly Report 2: Little Muddy River Watershed (1)
Quarterly Report 2: Little Wabash River Watershed (1)
Quarterly Report 2: Vandalia Lake Watershed (1)
Quarterly Report 3 (January-March 2002): West Branch DuPage River Watershed (1)
Quarterly Report 3: Beaucoup Creek Watershed (1)
Quarterly Report 3: Big Muddy River #1 Watershed (1)
Quarterly Report 3: Big Muddy River #2 Watershed (1)
Quarterly Report 3: Bonnie Creek Watershed (1)
Quarterly Report 3: Casey Fork Watershed (1)
Quarterly Report 3: Dutchman Creek Watershed (1)
Quarterly Report 3: Little Muddy River Watershed (1)
Quarterly Report 3: Little Wabash River Watershed (1)
Quarterly Report 3: Vandalia Lake Watershed (1)
Quarterly Report 4 (April-June 2002): West Branch DuPage River Watershed (1)
Quarterly Report 4: Beaucoup Creek Watershed (1)
Quarterly Report 4: Big Muddy River #1 Watershed (1)
Quarterly Report 4: Big Muddy River #2 Watershed (1)
Quarterly Report 4: Bonnie Creek Watershed (1)
Quarterly Report 4: Casey Fork Watershed (1)
Quarterly Report 4: Dutchman Creek Watershed (1)
Quarterly Report 4: Little Muddy River Watershed (1)
Quarterly Report 4: Little Wabash River Watershed (1)
Quarterly Report 4: Vandalia Lake Watershed (1)
Quarterly Report Dutchman Creek Watershed (2)
Quarterly Report: Beaucoup Creek Watershed (1)
Quarterly Report: Big Muddy River #1 Watershed (1)
Quarterly Report: Big Muddy River #2 Watershed (1)
Quarterly Report: Bonnie Creek Watershed (1)
Quarterly Report: Casey Fork Watershed (1)
Quarterly Report: Little Muddy River Watershed (1)
Quarterly Report: Little Wabash River Watershed (1)
Quarterly Report: Vandalia Lake Watershed (1)
Quarterly Report: West Branch DuPage River Watershed (1)
Rayse Creek (ILNK01) TMDL and Implementation Plan (1)
Rayse Creek Watershed Management Plan (1)
Regional Fecal Coliform TMDL on Salt Creek of Sangamon River and Lower Sangamon River Watersheds: Stage 1 Report: Watershed Characterization and Water Quality Analysis (1)
Regional Fecal Coliform TMDL on Salt Creek of Sangamon River and Lower Sangamon River Watersheds: Stage 3 Final Report (1)
Rend Lake Watershed TMDL Stage 1 Report: Draft Report (1)
Report to Governor: Capacity Development Program, 2002 (1)
Report to Governor: Capacity Development Program: September 30, 2005 (1)
Reporting Requirements for Livestock Waste Releases in Illinois (1)
Restoring Illinois Water Quality with TMDLs (1)
Rock River Basin Assessment: An Overview of the Rock River Watersheds in Illinois (1)
Salem City Reservoir Simazine Total Maximum Daily Load (TMDL): Draft Report (1)
Salt Fork Vermilion River Watershed TMDL Report (1)
Sample Collector's Handbook (1)
Sangamon River/Lake Decatur Watershed TMDL Report (1)
Sangamon River/Lake Decatur Watershed TMDL Stage One Third Quarter Draft Report (1)
Sediment Classification for Illinois Inland Lakes: 1996 Update (1)
Septic Systems (1)
Shoal Creek Atrazine Total Maximum Daily Load (TMDL): Draft Report (1)
Shoal Creek Watershed TMDL Implementation Plan: Public Review Draft Report (2)
Shoal Creek Watershed TMDL Report (1)
Shoal Creek Watershed TMDL Stage One Third Quarter Draft Report (1)
Shoreline Buffer Strips (1)
Shoreline Stabilization: Bioengineering Alternatives (1)
Skillet Fork Atrazine Total Maximum Daily Load (TMDL): Draft Report (1)
Skillet Fork Watershed TMDL Report (1)
Skillet Fork Watershed TMDL [Stage 3] (1)
Skillet Fork Watershed: Final Stage 1 Progress Report (1)
South Fork Saline - Lake Egypt Watershed TMDL Report (1)
South Fork Saline River/Lake of Egypt Implementation Plan: Draft Report (1)
South Fork Saline River/Lake of Egypt Watershed TMDL Stage One Third Quarter Draft Report (1)
South Fork Sangamon River/Lake Taylorville Watershed TMDL Report (1)
Spring Lake Atrazine Total Maximum Daily Load (TMDL): Draft Report (1)
Stage 2 - Water Quality Sampling Report for TMDLs in North Fork Vermilion River, Salt Fork Vermilion River, Sugar Creek, and Walnut Point Lake: Final Report (1)
Stage 2 Data Report: Final Report (1)
Stage 2 Report for TMDL Sampling Activities in the Upper Big Muddy River Watershed, Illinois (1)
State of Illinois Public Water Supply Loan Program Supplemental Intended Use Plan Pursuant to the American Recovery and Reinvestment Act of 2009: Final Intended Use Plan (1)
State of Illinois Section 319 - Biannual Report (9)
State of Illinois Section 319 - Biannual Report: March 2003 (1)
State of Illinois Section 319 - Biannual Report: March 2006 (2)
State of Illinois Section 319 - Biannual Report: March 2007 (1)
State of Illinois Section 319 - Biannual Report: March 2009 (1)
State of Illinois Section 319 - Biannual Report: March 2010 (1)
State of Illinois Section 319 - Biannual Report: September 2001 (2)
State of Illinois Section 319 - Biannual Report: September 2002 (1)
State of Illinois Section 319 - Biannual Report: September 2004 (1)
State of Illinois Section 319 - Biannual Report: September 2005 (2)
State of Illinois Section 319 Biannual Report (2)
State of Illinois Section 319 Biannual Report: March 2012 (1)
State of Illinois Water Pollution Control Loan Program Supplemental Intended Use Plan Pursuant to the American Recovery and Reinvestment Act of 2009: Final Intended Use Plan (1)
Stormwater Detention Ponds (1)
Stream Dissolved Oxygen Improvement Feasibility Study for Salt Creek: Final Report (1)
Stream Dissolved Oxygen Improvement Feasibility Study for the East Branch of the DuPage River: Final Report (1)
Streambank Cleanup and Lakeshore Enhancement (SCALE) Program (1)
Streambank Cleanup and Lakeshore Enhancement (SCALE) Program: Pilot (1)
Streambank Cleanup and Lakeshore Enhancement (SCALE) Program: Calendar Years 2007-2008 (1)
Streambank Cleanup and Lakeshore Enhancement (SCALE) Program: Calendar Years 2009-2010 (1)
Streambank Cleanup and Lakeshore Enhancement (SCALE) Program: Section 319-Project 0404, Calendar Year ... (1)
Streambank Cleanup and Lakeshore Enhancement (SCALE) Program: Section 319-Project 0404, Calendar Year 2003-2006 (1)
Sugar Creek / Lake Branch Watershed TMDL Report (1)
Sugar Creek Watershed TMDL Report (1)
Sugar Creek Watershed TMDL Stage One: Final Report (1)
Sugar Creek and Vermont City Reservoir TMDL Development Stage 1 Report: Final (1)
Surface Discharging Private Sewage Disposal Systems (Commonly Referred to as Septic Systems) and Their Effects on Communities in Illinois (1)
TMDL Development for Bonpas Creek Watershed (1)
TMDL Development for Evergreen Lake: Quarterly Report (1)
TMDL Development for Evergreen Lake: Quarterly Report #1 (1)
TMDL Development for Galena/Sinsinawa Rivers Watershed (1)
TMDL Development for Homer Lake in the Salt Fork Vermilion River Watershed, Illinois: Stage Three Report: TMDL Development (1)
TMDL Development for Horseshoe Lake Watershed (1)
TMDL Development for Lake Canton Watershed (1)
TMDL Development for Lake Michigan Beaches (1)
TMDL Development for Lake Springfield Watershed (1)
TMDL Development for Ohio River Watershed (1)
TMDL Development for Pecatonica River Watershed (1)
TMDL Development for Prairie Creek/Langan Creek Watershed (1)
TMDL Development for Rend Lake Watershed (1)
TMDL Development for Upper Big Muddy River Watershed (1)
TMDL Development for Vermont City Reservoir/Sugar Creek Watershed (1)
TMDL Development for the Cedar Creek/Cedar Lake Watershed, Illinois: Draft Report for IEPA Review (1)
TMDL Development for the Crab Orchard Creek Watershed, Illinois: Stage Three Report Public Review Draft (1)
TMDL Development for the Crooked Creek Watershed, Illinois: Public Review Draft (1)
TMDL Development for the Lake Oakland and Walnut Point Lake Watersheds: Final Report: Stage One Report: Watershed Characterization and Water Quality Analysis (2)
TMDL Development for the Lake Oakland and Walnut Point Lake Watersheds: Public Review Draft Report: Stage Three Report: Lake Oakland TMDL Development (1)
TMDL Development for the Little Vermilion River Watershed: Final Report (2)
TMDL Development for the Little Wabash River Watershed, Illinois: Draft Report for Public Review (1)
TMDL Development for the Little Wabash River Watershed, Illinois: Public Review Draft (1)
TMDL Development for the Mt. Olive New Lake, Mt. Olive Old Lake, and Staunton Lake Watersheds: Stage One Report: Watershed Characterization and Water Quality Analysis (2)
TMDL Development for the Salt Fork Vermilion River Watershed: Stage One Report: Watershed Characterization and Water Quality Analysis (1)
TMDL Development for the Shoal Creek Watershed, Illinois: Draft Report for Public Review (1)
TMDL Development for the South Fork Saline River/Lake of Egypt Watershed, Illinois: Public Review Draft Report (1)
TMDL Scoping Report Development for Lake Michigan (nearshore) Mercury and Polychlorinated Biphenyls (1)
TMDL and LRS Development for Middle Illinois River Watershed (1)
Tampier Lake/Saganashkee Slough Watersheds Stage One TMDL Draft Report (1)
Tampier Lake/Saganashkee Slough Watersheds Stage Three TMDL Draft Report (1)
Tampier Lake/Saganashkee Slough Watersheds TMDL Report (1)
The Condition of Illinois Water Resources (1)
Thorn Creek Watershed Based Plan (1)
Thorn Creek Watershed TMDL Stage 1 Report (1)
Total Maximum Daily Load Development for Altamont New Reservoir Watershed (1)
Total Maximum Daily Load Development for Beaucoup Creek Watershed (1)
Total Maximum Daily Load Development for Big Muddy River #1 Watershed (1)
Total Maximum Daily Load Development for Bonnie Creek Watershed (1)
Total Maximum Daily Load Development for Casey Fork Watershed (1)
Total Maximum Daily Load Development for Dutchman Creek Watershed (1)
Total Maximum Daily Load Development for Fox River (2)
Total Maximum Daily Load Development for Little Muddy River Watershed: Draft Final Report (1)
Total Maximum Daily Load Development for Vandalia Lake Watershed: Draft Final Report (1)
Total Maximum Daily Load Evergreen Lake Watershed: Stage One Final Report (2)
Total Maximum Daily Load Evergreen Lake Watershed: Stage Three Draft Report (1)
Total Maximum Daily Load Report for the Kankakee/Iroquois Watershed, Final (1)
Total Maximum Daily Load, Shoreline Segments in Chicago, Cook County, Illinois: 29 Segments from Juneway Terrace Park Beach to Calumet South Beach (1)
Total Maximum Daily Load, Shoreline Segments in Lake County, Illinois: 9 Segments from North Point Marina Beach to Highland Park Rosewood Beach (1)
Total Maximum Daily Loads for Salt Creek, Illinois: Final Report (1)
Total Maximum Daily Loads for West Branch DuPage River, Illinois (2)
Total Maximum Daily Loads for the East Branch of the DuPage River, Illinois (1)
Total maximum daily load, shoreline segments in Suburban Cook County, Illinois: 13 Segments from Glencoe Park Beach to Evanston South Beach (1)
Triennial Capacity Development Report (1)
Triennial Capacity Development Report, 2011 (1)
Triennial Capacity Development Report: Safe Drinking Water: Leveraging Resources and Planning for the Future, 2008 (1)
Up-dating the LaMoine River Watershed Implementation Plan (1)
Upper Big Muddy Watershed Total Maximum Daily Load Stage One Report (1)
Upper Fox River/Chain O' Lakes Watershed TMDL Final Stage 1 Report (1)
Upper Fox River/Flint Creek Watershed TMDL Final Stage 1 Report (1)
Upper North Branch Chicago River Watershed TMDL Stage 1 Report (1)
Utilizing Exception Criteria to Avoid Boil Orders after Pressure Loss (1)
Vandalia Lake TMDL Report (1)
Vermilion River Watershed (IL Basin) TMDL Report (1)
Vermilion River Watershed (Illinois Basin) TMDL for Nitrates and Bacteria: Stage 1 Report (1)
Villa Park Police Station Urban BMP Demonstration Project: A Project to Demonstrate Integration of Green Roof, Permeable Paving, and Bioswale Urban Runoff Systems (1)
Wabash River Nutrient and Pathogen TMDL Development: Final Report (1)
Wabash River Watershed TMDL Report (1)
Walnut Point Lake Watershed TMDL Report (1)
Walnut Point Lake Watershed Total Maximum Daily Load Stage Three Report (1)
Water Monitoring Strategy (1)
Water Pollution Control Loan Program (WPCLP) (1)
Water Pollution Control Loan Program Supplemental Intended Use Plan Pursuant to the American Recovery and Reinvestment Act of 2009: Final Intended Use Plan (1)
Waterborne Pathogens (1)
Watershed Implementation Plan for Lake Vermilion and the North Fork Vermilion River, Vermilion County, Illinois (1)
Watershed Plan and Diagnostic/Feasibility Study of Lake Carlinville, Macoupin County, Illinois (1)
Watershed Plan and Phase 1 Diagnostic/Feasibility Study of Lake Carlinville, Macoupin County, Illinois (1)
Where to Go for Lake Information (1)
Zebra Mussels (1)
Organization
Illinois Environmental Protection Agency, Bureau of Water[X]
XMLRecordID
000000015884 (1)
000000015885 (1)
000000024306 (1)
000000024324 (1)
000000024325 (1)
DateCreated
 

Title:  

2001 305(b) Summary Report (1999 data) Inland Lakes

 
 Volume/Number:    
 Issuing Agency:   
 Description:  In all, 369 lakes representing 156,994 acres were assessed. Overall lake use was fully or partially attained on 97.6 percent of the number and 97.4 percent of the acreage assessed. 
 Date Created:  07 13 2001 
 Agency ID:   
 ISL ID:  000000040101   Original UID: 20382 FIRST WORD: 2001 
 

Title:  

2008 Final Federal CAFO Rule Frequently Asked Questions

 
 Volume/Number:  2009 February 10 
 Issuing Agency:   
 Description:  This fact sheet provides answers to frequently asked questions about CAFOs. 
 Date Created:  02 11 2009 
 Agency ID:   
 ISL ID:  000000042825   Original UID: 22385 FIRST WORD: 2008 
 

Title:  

2008 Groundwater Protection Policy Forum: Groundwater Degradation and Sustainability, Pere Marquette, Peoria, IL, September 24th, 2008

 
 Volume/Number:    
 Issuing Agency:   
 Description:  The 2008 Groundwater Protection Policy Forum, entitled Groundwater Degradation and Sustainability, was designed to address and assess groundwater issues that the State of Illinois is facing at present, and will become increasingly important in the near and distant future. The rapid population growth of the urban areas of the state relies on the availability, sustainability, and quality of our groundwater resources. 
 Date Created:  04 15 2009 
 Agency ID:   
 ISL ID:  000000040034   Original UID: 20358 FIRST WORD: 2008 
 

Title:  

Altamont New Reservoir TMDL Report

 
 Volume/Number:  2004 October 
 Issuing Agency:   
 Description:  This report documents the analysis and findings of stage 1 of the TMDL development for water segments within this watershed. Water quality data are gathered by the IEPA, the US Geological Survey, and the USEPA. Illinois is required to identify water bodies that do not meet water quality standards and to determine the Total Maximum Daily Load for pollutants causing the impairment. 
 Date Created:  02 07 2005 
 Agency ID:  IEPA/BOW/03-011 
 ISL ID:  000000040705   Original UID: 20867 FIRST WORD: Altamont 
 

Title:  

Appendices to Cahokia Creek/Holiday Shores Lake Watershed Total Maximum Daily Load Stage Three Report

 
 Volume/Number:    
 Issuing Agency:   
 Description:  This report documents the analysis and findings of stage 1 of the TMDL development for water segments within this watershed. Water quality data are gathered by the IEPA, the US Geological Survey, and the USEPA. Illinois is required to identify water bodies that do not meet water quality standards and to determine the Total Maximum Daily Load for pollutants causing the impairment. 
 Date Created:  08 03 2007 
 Agency ID:   
 ISL ID:  000000042971   Original UID: 22501 FIRST WORD: Appendices 
 

Title:  

Aquatic Exotics

 
 Volume/Number:  1996 October 
 Issuing Agency:   
 Description:  Lake Notes is a series of publications produced by the Agency about issues confronting Illinois' lake resources. The objective of these publications is to provide lake and watershed residents with a greater understanding of environmental cause-and-effect relationships, and actions we all can take to protect our lakes. 
 Date Created:  12 01 2006 
 Agency ID:  Lake Notes 
 ISL ID:  000000042832   Original UID: 22392 FIRST WORD: Aquatic 
 

Title:  

Aquatic Plant Management Options

 
 Volume/Number:  1997 November 
 Issuing Agency:   
 Description:  Lake Notes is a series of publications produced by the Agency about issues confronting Illinois' lake resources. The objective of these publications is to provide lake and watershed residents with a greater understanding of environmental cause-and-effect relationships, and actions we all can take to protect our lakes. 
 Date Created:  12 13 2006 
 Agency ID:  Lake Notes 
 ISL ID:  000000042833   Original UID: 22393 FIRST WORD: Aquatic 
 

Title:  

Arsenic in Illinois Groundwater

 
 Volume/Number:  2001 November 
 Issuing Agency:   
 Description:  This white paper presents answers to frequently asked questions about arsenic in Illinois groundwater. 
 Date Created:  01 11 2002 
 Agency ID:   
 ISL ID:  000000042921   Original UID: 22451 FIRST WORD: Arsenic 
 

Title:  

Artificial Structures for Fish Cover

 
 Volume/Number:  2004 January 
 Issuing Agency:   
 Description:  Lake Notes is a series of publications produced by the Agency about issues confronting Illinois' lake resources. The objective of these publications is to provide lake and watershed residents with a greater understanding of environmental cause-and-effect relationships, and actions we all can take to protect our lakes. 
 Date Created:  12 08 2006 
 Agency ID:  Lake Notes 
 ISL ID:  000000042838   Original UID: 22398 FIRST WORD: Artificial 
 

Title:  

Ashland New Lake Watersheds TMDL Stage Three Draft Report

 
 Volume/Number:  2009 July 
 Issuing Agency:   
 Description:  This report documents the analysis and findings of stage 1 of the TMDL development for water segments within this watershed. Water quality data are gathered by the IEPA, the US Geological Survey, and the USEPA. Illinois is required to identify water bodies that do not meet water quality standards and to determine the Total Maximum Daily Load for pollutants causing the impairment. 
 Date Created:  08 03 2009 
 Agency ID:   
 ISL ID:  000000042943   Original UID: 22473 FIRST WORD: Ashland 
 

Title:  

Ashland New Reservoir watershed TMDL report

 
 Volume/Number:  2009 November 
 Issuing Agency:   
 Description:  This report documents the analysis and findings of the TMDL development for water segments within this watershed. Illinois is required to identify water bodies that do not meet water quality standards and to determine the Total Maximum Daily Load for pollutants causing the impairment. 
 Date Created:  12 11 2008 
 Agency ID:  IEPA/BOW/09-004 
 ISL ID:  000000024808   Original UID: 12063 FIRST WORD: Ashland 
 

Title:  

Ashland New Reservoir Watershed TMDL Stage One Draft Report

 
 Volume/Number:  2008 October 
 Issuing Agency:   
 Description:  This report documents the analysis and findings of stage 1 of the TMDL development for water segments within this watershed. Water quality data are gathered by the IEPA, the US Geological Survey, and the USEPA. Illinois is required to identify water bodies that do not meet water quality standards and to determine the Total Maximum Daily Load for pollutants causing the impairment. 
 Date Created:  10 14 2008 
 Agency ID:   
 ISL ID:  000000042942   Original UID: 22472 FIRST WORD: Ashland 
 

Title:  

Assessment of Total Chromium in Illinois Community Water Supplies

 
 Volume/Number:  2011 March 
 Issuing Agency:   
 Description:  United States Environmental Protection Agency (U.S. EPA) regularly revaluates drinking water standards and, based on new science, the agency launched a rigorous and comprehensive review of chromium-6 health effects following the release of the toxicity studies by the National Toxicology Program in 2008.The Illinois EPA has been designated as the lead state agency for primary enforcement authority and oversight for the community water supplies (CWS) in Illinois. The Illinois Pollution Control Board, pursuant to Sections 7.2 and 17.5 of the Illinois Environmental Protection Act, is required to adopt the drinking water standards, compliance monitoring points, and approved analytical method detection limits promulgated by the U.S. EPA. 
 Date Created:  03 01 2011 
 Agency ID:   
 ISL ID:  000000040072   Original UID: 20377 FIRST WORD: Assessment 
 

Title:  

Baseline Loadings of Nitrogen, Phosphorus, and Sediments from Illinois Watersheds

 
 Volume/Number:  1999 November 
 Issuing Agency:   
 Description:  The purpose of this report was to evaluate baseline loadings of nutrients and sediment to the Mississippi River from the state of Illinois and to identify the sources of those loads. During the course of preparing this information, it was deemed appropriate to include similar information on the portion of Illinois which drains into the Ohio River basin. The Illinois EPAs Ambient Water Quality Monitoring Network was selected as the data set to conduct this analysis because it provided a statewide network with consistent sampling and analysis methods over an extended period of time. The network consists of 209 stations on streams ranging in size from agricultural drainage ditches to the Mississippi River. The time period for data selected was from October 1980 through September 1996. 
 Date Created:  12 08 2008 
 Agency ID:  IEPA/BOW/99-020 
 ISL ID:  000000040111   Original UID: 20387 FIRST WORD: Baseline 
 

Title:  

Bay Creek Watershed TMDL Report

 
 Volume/Number:  2007 November 
 Issuing Agency:   
 Description:  This report documents the analysis and findings of stage 1 of the TMDL development for water segments within this watershed. Water quality data are gathered by the IEPA, the US Geological Survey, and the USEPA. Illinois is required to identify water bodies that do not meet water quality standards and to determine the Total Maximum Daily Load for pollutants causing the impairment. 
 Date Created:  12 11 2007 
 Agency ID:  IEPA/BOW/07-023 
 ISL ID:  000000040706   Original UID: 20869 FIRST WORD: Bay 
 

Title:  

Bay Creek Watershed TMDL Stage One Third Quarter Draft Report

 
 Volume/Number:  2006 June 
 Issuing Agency:   
 Description:  This report documents the analysis and findings of stage 1 of the TMDL development for water segments within this watershed. Water quality data are gathered by the IEPA, the US Geological Survey, and the USEPA. Illinois is required to identify water bodies that do not meet water quality standards and to determine the Total Maximum Daily Load for pollutants causing the impairment. 
 Date Created:  06 05 2006 
 Agency ID:   
 ISL ID:  000000042945   Original UID: 22475 FIRST WORD: Bay 
 

Title:  

Bay Creek Watershed TMDL Stage Three Report

 
 Volume/Number:  2007 August 
 Issuing Agency:   
 Description:  This report documents the analysis and findings of stage 1 of the TMDL development for water segments within this watershed. Water quality data are gathered by the IEPA, the US Geological Survey, and the USEPA. Illinois is required to identify water bodies that do not meet water quality standards and to determine the Total Maximum Daily Load for pollutants causing the impairment. 
 Date Created:  08 02 2007 
 Agency ID:   
 ISL ID:  000000042944   Original UID: 22474 FIRST WORD: Bay 
 

Title:  

Beaucoup Creek TMDL Report

 
 Volume/Number:  2004 June 
 Issuing Agency:   
 Description:  This report documents the analysis and findings of stage 1 of the TMDL development for water segments within this watershed. Water quality data are gathered by the IEPA, the US Geological Survey, and the USEPA. Illinois is required to identify water bodies that do not meet water quality standards and to determine the Total Maximum Daily Load for pollutants causing the impairment. 
 Date Created:  02 07 2005 
 Agency ID:  IEPA/BOW/04-013 
 ISL ID:  000000040707   Original UID: 20870 FIRST WORD: Beaucoup 
 

Title:  

Beavers and Muskrats

 
 Volume/Number:  2001 February 
 Issuing Agency:   
 Description:  Lake Notes is a series of publications produced by the Agency about issues confronting Illinois' lake resources. The objective of these publications is to provide lake and watershed residents with a greater understanding of environmental cause-and-effect relationships, and actions we all can take to protect our lakes. 
 Date Created:  12 01 2006 
 Agency ID:  Lake Notes 
 ISL ID:  000000042834   Original UID: 22394 FIRST WORD: Beavers 
 

Title:  

Big Muddy River TMDL Report

 
 Volume/Number:  2004 October 
 Issuing Agency:   
 Description:  This report documents the analysis and findings of stage 1 of the TMDL development for water segments within this watershed. Water quality data are gathered by the IEPA, the US Geological Survey, and the USEPA. Illinois is required to identify water bodies that do not meet water quality standards and to determine the Total Maximum Daily Load for pollutants causing the impairment. 
 Date Created:  03 03 2005 
 Agency ID:  IEPA/BOW/04-015 
 ISL ID:  000000040708   Original UID: 20872 FIRST WORD: Big 
Page: 1 2 3 4 5   ...  Next